Poland : Heating system
EXTENSIVE THERMAL MODERNIZATION OF PUBLIC FACILITIES IN KROSNO (INDOOR SWIMMING POOL IN UL. SPORTOWA) – MODERNIZATION OF THE HEATING SYSTEM AT THE INDOOR SWIMMING POOL IN KROSNO
Insulation of the external walls executed with foamed polystyrene using light-wet method. Replacement of windows and doors complete with the frames. Modernization of the mechanical ventilation system through implementing the mechanical intake/uptake installation employing four modular swimming pool air handling units provided with heat recovery systems. Modernization of the hot water system through the implementation of solar collectors installation.
Extimated costs: PLN 4.454.574,62 (euro 1.012.000).
Expected tender date: June 2009.
Info: Elzbieta Polak tel: 0048 13 43 67 347
email: polak.elzbieta@um.krosno.pl.