Poland : Heating system

June 6th, 2009

EXTENSIVE THERMAL MODERNIZATION OF PUBLIC FACILITIES IN KROSNO (INDOOR SWIMMING POOL IN UL. SPORTOWA) – MODERNIZATION OF THE HEATING SYSTEM AT THE INDOOR SWIMMING POOL IN KROSNO
 
Insulation of the external walls executed with foamed polystyrene using light-wet method. Replacement of windows and doors complete with the frames. Modernization of the mechanical ventilation system through implementing the mechanical intake/uptake installation employing four modular swimming pool air handling units provided with heat recovery systems. Modernization of the hot water system through the implementation of solar collectors installation.

Extimated costs: PLN 4.454.574,62 (euro 1.012.000).

Expected tender date: June 2009.
Info: Elzbieta Polak tel: 0048 13 43 67 347
email:  polak.elzbieta@um.krosno.pl.

admin Projects, Tenders

Poland : Solar Energy in Warsaw

June 6th, 2009

USE OF SOLAR ENERGY IN HOUSING COMMUNITY’S MULTIFAMILY BUILDING AT MASZEWSKA 37, WARSAW
 
Solar collector purchase and installation.

Estimeated costs:  PLN 182.000 (euro 41.000).

Expected tender daet: July 2009.

Info:: Micha Krawczyk
tel: 0048 602 18 78 50

Email:  michal.k@soeto.pl.

admin Projects, Tenders

Pland : Solar Energy

June 6th, 2009

USING OF SOLAR ENERGY TO PREPARE HOT WATER FOR SPORT AND LEISURE CENTER RYSY IN BUKOWINA TATRZANSKA
 
Buy and montage of solar system consists of: Solar collectors with total absorption 172,53 m2; Water tanks with total capacity 3000 dm3 (3×1000m3); Swimming pool’s Heat exchanger; Vessels; Heat meter; Automatic system; Fittings. Valore stimato della commessa PLN 508.963 (pari a circa euro 115.000).

Expected Date of tender: July 2009.

INFO: Maria Kozera tel: 0048 602 403 344,
fax: +4818207 72 24
email:  mkoz@rysy.bukowinatatrzanska.pl.

admin New Plants, Projects

China : PHENOL ACETONE PLANT

June 6th, 2009

 PROJECT OF 200,000-TON PHENOL ACETONE IN SEAPORT ECONOMIC DEVELOPMENT ZONE COOPERATION MODE: JOINT VENTURE, COOPERATIVE OR SOLE PROPRIETORSHIP TEL. +86 315 2825233/2821720 E-MAIL: TSCOMIP@YAHOO.COM.CN
 
The project aims to build producing line of 200,000-ton/y Phenol Acetone by cumene process and down-strwam products. After put into operationm the annual sales volume is estimated to 20 million with annual average profit and the tax of 21 million, annual average profit of 12 million,profit payments and tax turnover rate of 16.5%, and profit rate of 9.4% www.tscom.gov.cn

admin Projects