Poland :BIOMASS GASIFICATION SYSTEM

June 24th, 2009

CONSTRUCTION OF THE BIOMASS GASIFICATION SYSTEM BASED ON THE FLUIDIZED, TOROIDAL BED GASIFIER IN MZEC SWIDNICA
 
Design and building of the plant for gasification of biomass in form of loose straw or wood chips alternatively.
Ext. costs: PLN 6.050.000 (+/– 1.375.000 euros ).

Tender date: July 2009.

Info: Bogdan Ryndziewicz

tel: 0048 748524041 ryndziewicz@mzec.swidnica.pl.

Financed by EU EcoFund 

admin EU: external cooperation, European Union, New Plants, Tenders

Poland : Solar Collector

June 19th, 2009

 PURCHASE AND INSTALLATION OF SOLAR COLLECTOR
 
PURCHASE AND SUPPLY SOLAR INSTALLATION,FITTING TOGETHER WITH EQUIPMENT.

Extimated Costs  PLN 251.004 (euro 57.000).

Tender DAte 2009  17th July

More Info  MALGORZATA OLCZYK tel: 0048 091 486 12 00 znhenko@o2.pl.

UE Ecofund

 

admin European Union, New Plants, Tenders

Pland : Solar Energy

June 6th, 2009

USING OF SOLAR ENERGY TO PREPARE HOT WATER FOR SPORT AND LEISURE CENTER RYSY IN BUKOWINA TATRZANSKA
 
Buy and montage of solar system consists of: Solar collectors with total absorption 172,53 m2; Water tanks with total capacity 3000 dm3 (3×1000m3); Swimming pool’s Heat exchanger; Vessels; Heat meter; Automatic system; Fittings. Valore stimato della commessa PLN 508.963 (pari a circa euro 115.000).

Expected Date of tender: July 2009.

INFO: Maria Kozera tel: 0048 602 403 344,
fax: +4818207 72 24
email:  mkoz@rysy.bukowinatatrzanska.pl.

admin New Plants, Projects

China : AMT Automatic Manual Transmissions Production Line

June 3rd, 2009

I. Project Name Technical Innovation Project of AMT Production Line
II. Project Implementation Agency Shaanxi Dongfeng Changhe Auto Axle Co., Ltd.
III. Project Description The project is planned to reconstruct the existing workshop and purchase AMT transmission and the key parts of operating system of processing center, computer circuit board and electronic equipments and 500,000 sets of numeral controlled equipped. It is planned to build a production line which can produce 100,000 sets ATM products for 3-5 kinds of car. The feasibility Study Report was completed. The sample cart has passed the 12000km test by car division of State Development and Planning Commission.
IV. Total Investment and Cooperation Form Total investment of the project is RMB 42 million including circulation capital of RMB 12.4 million. Cooperation form: joint venture, cooperation, stock participation or compensation trade.
V. Anticipation of Market and Analysis of Investment Return After the project is completed, the annual sales income about RMB 300 million and profit of RMB 37.59 million will be realized. www.chinabidding.org

admin New Plants, Projects