China : WUPAI HYDROPOWER

May 7th, 2009

WUPAI HYDROPOWER ON THE GREAT SUIFEN RIVER, DONGNING COUNTY
 
Region Heilongjiang Province Approved By Category Energy & Chemical Total Investment USD 25.14 Million Published Date May 5, 2009 Name of project: Wupai Hydropower Project on the Great Suifen River, Dongning County Scale of project: Total installed capacity: 22,000KW Brief description on the project: This hydropower station lies on the Great Suifen River in northeast China, Wupai Village, Suifenhe Town, Dongning County, 70km away from the Dongning Town, the traffic is convenient. The Great Suifen River originates in the Laoyeling, Changbai Mountain, whose elevation is 800m. In the upper reaches of the Wupai Hydropower Station, many branch rivers, including the Huangni River, Hancong River, Dahamo River, Laomuzhu River, etc. flow into the Great Suifen River. The drainage area on the dam is 4,438 km2, the average flow of many years is 20.69m3/s, and the average amount of water of many years is 652million m3. This project will make use of the water head of 60m high, excavate tunnel (cavity) of 5,800 long. The dam is 30m high, and the storage capacity is 126million m3, which can be adjusted in different periods. The reservoir to be built will submerge cultivation land of 360mu, woodland of 1,200mu, bottomland of 3,100mu, there’re no household to be transferred. The designed total installed capacity of this hydropower station is 22,000KW, which will generate electricity of 72million kwh/y. The equipment will be used for 3,270 hours. The unit investment per kw is RMB8,000 yuan, and total investment is RMB176million yuan. The distance from the power grid is 4.5km. The construction period: 2.5y. The hydropower is a kind of clean, recycled energy, and the current electricity price can be further raised. Therefore, this project is promising. Investment estimate and source: Total investment: USD25.14million. Estimated economic benefit after the project construction is completed: annual pure profit: USD3.30 million, annual output value: USD3.60millipn.

The investment payoff period: 7.6 years.

Domestic investor: Heilongjiang Jingpohu Agricultural Development Ltd.

Address: Bohai Town, Ning’an City, Heilongjiang Province

3. Introduction to the enterprise: Heilongjiang Jingpohu Agricultural Development Ltd., registered in 2001 with registration capital of RMB50million yuan, is a joint-stock privately owned enterprise, having general assets of RMB210million yuan. The company is grading AAA customer of the Chinese Agricultural Bank, Heilongjiang Branch, the “Gold Customer” of Mudanjiang Rural Credit Cooperative, the leading enterprise in the national agricultural industrialization, the provincial hi-tech enterprise, and the demonstration enterprise in the national farm produce processing. The main business of the company is deep-processing of maize. www.chinabidding.org

admin Uncategorized , , ,

Panama : water works

May 4th, 2009

IMPROVING THE SYSTEM FOR DRINKING WATER SUPPLY of CHEPO, the second stage. (DESIGN AND CONSTRUCTION FOR EXPANSION OF THE PLANT drinkable CHEP, WITH A TOTAL CAPACITY OF 2764 million gallons per day).

The modalities of participation, forms and other information subject to this tender are available on the website link in www.panamacompra.gob.pa: Business Opportunities / Construction.

Deadline for buying documents: 2009–05–13

Deadline for offers. 2009–06–09

For participation it is necessary to submit a deposit of 10% of the bid.

 

INSTITUTO DE ACUEDUCTOS Y ALCANTARILLADOS NACIONALES (IDAAN)
Contact:  Vianka Sánchez
Paese:  PANAMA
Indirizzo:  Auditorio Dr. Sergio González Ruiz, Ubicados en el 4to. Piso, IDAAN, Via Brasil, No. 18, Ciudad de Panamá, Rep. de Panamá.
Phine:  +507 223-8640 
Fax:  +507 264-6386
E-mail:  -
Web:  http://www.idaan.gob.pa

admin Uncategorized , ,

South Africa : Platinum Mine

April 30th, 2009

BLUE RIDGE PLATINUM-GROUP METALS PROJECT, SOUTH AFRICA
Blue Ridge platinum-group metals (PGMs) project, Bushveld Complex, South Africa.

The project envisages a mine comprising two decline shafts, which, at full capacity, will extract 120 000 t/m, with a mill head grade of 3,3 g/t of PGMs, producing 75 000 oz/y of platinum, 35 000 oz/y of palladium, 13 000 oz/y of rhodium and 1 600 oz/y of gold, totalling 125 00oz/y over a projected life-of-mine of 18 years.
An offtake agreement has been signed with Impala Refining Services under which Impala has committed to acquire all the proposed production from the Blue Ridge mine. Value Banking finance has been signed for $107-million. Duration The mine is scheduled to reach full capacity mid-2009. Client Ridge Mining and Imbani Platinum. In 2007, Imbani Platinum acquired a 50% stake in the project. Key contracts and suppliers The Industrial Development Corporation , the Development Bank of Southren Africa, Standard Bank and Investec (project finance); SRK South Africa (environmental and social studies); Ralph Morris Associates (reserves and mine planning); Murray & Roberts Cementation (mining contractor); and Bateman Engineering (process plant design).
Contact details for project information Ridge Mining, tel +44 20 7379 1474 or fax +44 20 7379 9443.

Email : admin@ridgemining.com

admin Uncategorized , ,

India : FERMENTATION Plant

March 4th, 2009

Dharani Sugars & Chemicals engaged in the manufacture of sugar and its by-products is planning to set up an ethanol unit at Kalayanallur in Villupuram district of TN. The project entails an investment of Rs.668.1 million. Vasantdada Sugar Institute, Pune has been appointed as the project consultant and negotiations are underway for the selection of major equipment suppliers. As of January 2009, technical feasibility study is underway. The project is slated for commissioning in 8 months from zero date

Dharani Sugars & Chemicals Ltd, PGP House, No. 57, Sterling Road, Nungambakkam, Chennai 600 034, Tamil Nadu
Phone : +91-44-28207480 to 82
Fax : 28232076

admin New Plants, Projects, Uncategorized ,