China : Waster Water Treatment Equipment

May 10th, 2009

Invitation For Bids: Waster Water Treatment Equipment
CMC International Tendering Co. entrusted by the purchaser, invites sealed bids from eligible suppliers home and abroad for the supply of the following goods and/or service by way of International Competitive Bidding .

Name of Products/Equipment, Quantity, and Main Technical Data:

Utilizing Finnish government loan to purchase waster water treatment equipment.

Time of Selling Bidding Documents: from 2009-05-05 15:19 to 2009-06-10 10:00(except holidays and lunch break)

4.Place of Selling Bidding Documents: Room No.505, Genertec Plaza, No. 90, Xisanhuan Zhonglu, Fengtai District, Beijing
5.The Deadline for Submitting Bids/Time of Bid Opening (Beijing Time): 2009-06-10 10:00
.Place of Bid Opening: Genertec Plaza, No. 90, Xisanhuan Zhonglu, Fengtai District, Beijing Addr: F/6-8,Genertec Plaza,No.90,Xisanhuan ZhongLu Fengtai District
Document cost:  6000 RMB
Deadline for buying documents:  2009–06–10
Offers deadline:  10/06/2009–06–10

Contacts:

CMC International Tendering Corporation
Address: Beijing Fengtai District, 90 West Third Ring Road, 6-8 storey building generic technology
Post Code: 100055
Tel: (8610) 63348383,63348586
Fax: (8610) 63373537

E-mail: citc@citc.genertec.com.cn

admin Tenders , ,

China : Jinfu Coal Mine Construction

May 7th, 2009

Project Of Jinfu Coal Mine Construction Region Shanxi Province Approved By Category Metallurgy & Mining Total Investment

Project progress: Checking stage Recent Project progress: carry on previous works

The project construction size is annual production capacity of 1,800,000 ton. Project name: Project Of Jinfu Coal Mine Brief introduction: The project construction size: The project, Jinfu Coal Mine is located in west of Liuduandi County, Dongyu Village, Qingxu Town, acquired mining right in Oct.2004, listed in provincial ”two regions”development projects in July.2006 ,provincial coal industry ”11th five-year ”coal Development Program(option) and state mine field general planning in Sep.2007. Approved mine area: 19.4763km2. Those works,” one five-ping” project, river repair, 1,500,000 m2 earthwork rechannel, repairing roads of 12km, spanning 35kv lines of 10km and communication line of 10km, are completed now with completed investment of more than 90 million Yuan. The project construction size is annual production capacity of 1,800,000 ton. The investment is unknown. Meijin Coal Mine gasification Co., Ltd is one of key enterprises of undertaking gas produce and supply for resident manufacture and living-used in Qingxu county, Taiyuan urban district. Because of lack of self coal source basement, normally gas supply in cities has been influenced by coal price fluctuation and coal source intensity from time to time. So Meijin Coal Mine gasification Co., Ltd will construct assorted a set of Jinfu coal mine with annual design production capacity of 1,800,000 ton.
  http://www.chinabidding.org

admin New Plants, Projects , ,

China : ORGANIC SILICON

May 7th, 2009

PROJECT OF ORGANIC SILICON IN NEW FOUNDATION RAW MATERIAL PROCESSING ZONE OF HEIHE BORDER ECONOMIC COOPERATION REGION REGION HEILONGJIANG PROVINCE APPROVED BY CATEGORY ENERGY & CHEMICAL TOTAL INVESTMENT US $164.3836 MILLION

Name of project: Organic Silicon Project in New Foundation Raw Material Processing Zone of Heihe Border Economic Cooperation Region Project Scale: The annual output of organic silicon is 120,000 tons. Brief description on the project: The project site lies in the southeast industrial zone of Heihe, the total estimated investment is 1.2 billion yuan, it is planned to build units for the production of 120,000-ton/year organic silicon, the construction period is 2 years. For the project construction, Heihe has two apparent advantages on the aspects of industrial silicon as raw material and power. Heihe has 6 enterprises for the production of industrial silicon, including Guangming Company, in 2007, the production capacity of industrial silicon may reach 100,000 tons, these enterprises may provide raw material for the production of organic silicon; the project enjoys preferential electricity price and “Preferential policies of Heihe on investment promotion and attraction” Heihe has perfect infrastructure facilities, the traffic and transport are convenient. The works of 1.5 square kilometers of infrastructure facilities in the southwest industrial zones will be completed in 2007. The pre-feasibility study report on the project has been completed.. Sales direction of product: Domestic sale Investment estimate and source: The estimated total investment of the project is US$164.3836 million, the investment proportion may be negotiated about. Cooperation means: solely investing, joint venture, cooperation. Estimated economic benefit after the project construction is completed: The annual sales income is US$438.3562 million, the tax is US$26.0274 million and the net profit of the enterprise is US$27.9373 million. www.chinabidding.org

admin New Plants, Projects , ,

China : CIVIL AVIATION UNIVERSITY

May 7th, 2009

PROJECT OF CIVIL AVIATION UNIVERSITY OF CHINA (PHASE III) EXTENSION WORKS TCOUNTRY CHINA REGION TIANJIN MUNICIPALITY APPROVED BY CATEGORY CONSTRUCTION TOTAL INVESTMENT 1060.8861 MILLION YUAN PUBLISHED DATE APRIL 27, 2009
 
Cockpit by benis979 at sxcProject progress: feasibility study report Main Equipments: Fire fighting device, Safety protection device, water supply and sewage device, electrical installation, ventilation device, lighting device. Recent project progress:research for approval Abstract:The project overall floorage is 235.7 thousand m2, and the total investment is 1060.8861 million Yuan. Project name:Project Of Civil Aviation University Of China (Phase III) Extension Works Construction period:From 2010 to 2011 Brief Introduction: The project is located in Xinli County, Dongli district, Tianjin City with overall floorage of 235.7 thousand m2. The main construction content concludes two parts. The part I: 35.7 thousand m2 of engineering projects practice base, 30 thousand m2 of air control training base, 10 thousand m2 of postgraduate education occupancy,50 thousand m2 of students living housing; The part II: 15 thousand m2 of postgraduate institute, 15 thousand m2 of science and technology library, 30 thousand m2 of integrated instruction laboratory building, 4000 m2 of flight training building, 14 thousand m2 of student hostel, 10 thousand m2 of foreign student apartment and academic exchange center, 10 thousand m2 of student dining hall, 5000 m2 of student activation center and 7000 m2 of accessory occupancy. The total investment is 1060.8861million Yuan. www.chinabidding.org