Switzerland : Demoliton and Reahbilitaton works

April 24th, 2009

Maintenance project Lenzburg - Birrfeld, PP1

2.2 Detailed Description of Duties:

Demolition work
Demolition profile arrest 7′200 m
Demolition of 330 items gullies
Demolition of control rooms 50 rooms
Demolition covers 230 control rooms
Demolition of collectors covers 190 items
Demolition of concrete culverts 5′900 m
Demolition waste pipes water 1,700 m
Rehabilitation of waste pipes water surface:
Sanitation robot 4′000 m
Sanitation pipes 400 m
Pipe work:
Demolition grids 160 pieces
Excavation of trenches U 2′100 m3
Transportation of excavated material to landfill
1,800 m3
Construction batteries tubes 3′800 m
Construction of gates 120 pieces
Adapting grids 80 pieces
Backfilling of trenches with the grave I 900 m3
Earthworks:
Dégrappage of topsoil 8′700 m3
Laying topsoil 40′000 m2
Dégrappage 24′600 m3
Work remblai 2′700 m3
Transport of topsoil to discharge residues
stabilized 1,300 m3
Transportation of excavated material to landfill
for inert materials 16′400 m3
Layers of foundation:
Laying of foundation layers serious I 26′500 m3
Preparation of planie 221′600 m3
Work surface:
Sawing Bituminous coatings 17′300 m
Excavation of trenches in bituminous coatings
11′800 m2
Milling bituminous coatings 302′200 m2
Sawing concrete cover, thickness 200 mm 7′700 m
Demolition of the concrete cover, thickness 200 mm
123′200 m2
Transportation of bituminous materials to the demolition discharge 25,000 m3
Transportation of concrete demolition to landfill 24′600 m3
Laying of foundation layers of AC F 50,000 t
Poses layers AC T 22 H 44′000 t
Pose layers liaison AC B 22 H 55′000 t
Laying bituminous profiles judgments 8′300 m
Laying of asphalt concrete grained high Mastic
ADM 11 1500 t
Laying asphalt draining PA 8 16′000 t
Laying asphalt macrorugueux AC MR 1,100 t 8
Moving grid covers 290 pieces
Enhancement grid covers 290 pieces
Pipes and drainage:
Excavation of trenches U 5,000 m3
Re trenches drainage 3,500 m
Transportation of excavated material to landfill 5,000 m3
Supply and installation of pipes polypropylene 2′700 m
Supply and installation of gutters 7′200 m
Installation of control rooms 50 rooms
Installation of 350 pieces gullies
Supply and installation of concrete coating 700 m3
Backfilling of trenches with the grave I 4′200 m3
Restraint systems in vehicles and railings:
Dismantling of the restraint system A 20′800 m
Transport of a restraint system to discharge 20′800 m
Excavation 2,300 m3
Laying the foundation continues 5′500 m
Installation of the restraint system vehicles LS
150′180 15′000 m
Mounting the mobile vehicle restraint
(Varioguard) 8′400 m
Establishment of crossings of the berm Central 7 parts

Marking of traffic areas:
Marking of safety lines 45′300 m
Marking lines 22′500 m
Marking of direction arrows 15 pieces
Marking of traffic surfaces prohibited 4′400 m2
Objects and 2 PP 3 PP:
Dismantling barriers walls 350 m2
Demolition of concrete 1′230 m3
Removal of concrete up to 40mm 740 m2
Removal of concrete with release of the armature 740 m2
Reprofiling mortar 40 - 60 mm 1′480 m2
Hydrophobic impregnation 2′050 m2
Waterproofing 2′050 m2

Office fédéral des routes OFROU
Service organisateur/Entité organisatrice:
Office fédéral des routes OFROU
Filiale de Zofingue
Gestion des projets II
Brühlstrasse 3
4800 Zofingue / CH
Téléphone: +41 62 745 75 11/Fax: +41 62 745 75 90
E-mail: zofingen@astra.admin.ch
URL: www.astra.admin.ch

admin Projects, Tenders , ,

Serbia Montenegro: Works on Tunnel

April 10th, 2009

INVITATION FOR TENDERS

Railways of Montenegro intends, using part of the proceeds of a loan from the European Bank for Reconstruction and Development towards the cost of a project to undertake emergency rehabilitation of the railway infrastructure.

The Employer now invites sealed tenders from contractors for the following contract to be funded from part of the proceeds of the loan: Works on Tunnel, on the Montenegro railway lines.

The works are about the rehabilitation of Tunnel - Tunnel n.182 Ostrovica from km 347 + 172.44 to km 350 + 999.75

Tendering for contracts to be financed with the proceeds of a loan from the Bank is open to firms from any country.

To be qualified for the award of a contract, tenderers must satisfy the following minimum criteria regarding experience, personnel, equipment, financial position and litigation history, specified below and/or as detailed in the Tender documents:

1. General Experience: - Annual turnover > Euro Four (4) million equivalent in last Five (5) years. - At least Three (3) projects similar in the last Five (5) years.

2. Personnel Capabilities

3. Equipment Capabilities

4. Financial Position: to meet construction cash flow not less than euro 500,000.

5. Litigation History Tender documents may be obtained from the office at the address below upon payment of a non-refundable fee of EURO 200. and should be paid to Eljeznicka Infrastruktura Crne Gore AD account number 400876851700 EUR, SWIFT CODE CKBCMEPG for bidders from abroad or account number 510-22146-47 for bidders from Montenegro, accounts at Crnogosrska Komercijalna Banka AD, Podgorica

If requested, the documents will be promptly dispatched by courier and, in addition, electronically via e-mail but no liability can be accepted for loss or late delivery. All tenders must be accompanied by a tender security of Euro 70,000 or its equivalent in a convertible currency.

Tenders must be delivered to the office at the address below on or before Tuesday 09 /06 /2009 at 12:00 hrs (Podgorica, local time), at 12:30 hrs p.m.

Tenders will be opened in the presence of those tenderers representatives who choose to attend. A register of potential tenderers who have purchased the tender documents may be inspected at the address below. Prospective tenderers may obtain further information from, and inspect and acquire the tender documents at, the following office:

Mrs. Tatijana Bulatovic eljeznicka Infrastruktura
Crne Gore AD (ZICG) Trg Golootockih rtava 13 81000 Podgorica,
Montenegro

Tel: +382 20 441 450 / +382 69 319 408 Fax: +382 20 441 235

E-mail: tatjana.bulatovic@zicg.me

This notice refers to goods, works, services or consultancy services to be procured through open and competitive tendering for projects financed by the EBRD. Potential tenderers desiring additional information on the procurement in question or the project in general should, unless indicated otherwise, contact the project agency and not the EBRD.

admin Projects, Tenders , , ,

China : CUIJIABA NANLIDU SCENIC SPOT DEVELOPMENT

March 25th, 2009

Market Assess

The development of Nanlidu Scenic Spot can help form the scenic belt from Xintang Honghuatang Stone Forests to Xiaoxikou of Jianshi County.

The project can manage to meet the demands of tourists who are of different levels and of different ages, for it can make tourists feel that they are close to the nature. It is believed that every year the spot will receive more than 50,000 tourists and the number will increase at the rate of 15%in the following years.

Construction Scale of the Project

The project plans to make full use of the existing surroundings and it will try to suit measures to local conditions and design the most suitable overall arrangement for the scenic spot. The project holds the principle that characteristics should always be emphasized and other construction work to form complete set should also be completed as soon as possible. Duiquewo Drifting Zone as well as zone for doing exciting games will be set up immediately according to the schemes of the project.

Investment of the Project

According to the evaluation, the total investment will be 55,600,000RMB, of which 50,000,000RMB belongs to the fixed assets investment and 5,600,000RMB is the floating funds.

Beneficial Result Analysis

With the development of the economy, more and more people will move to towns or cities. Therefore, more and more people will love visiting the countryside and experiencing the primitive life in the countryside. The project plans to make full use of the local characteristic diets so that visitors can experience the all-round Tujia Way of life personally. Living in the local farmers’ houses, visitors can deeply feel the customs and cultures of Tujia minority. The unique diet here includes a kind of special fish and mutton, which are known to most native people. Suppose in the first year after the project is put into practice 50,000 tourists visit here and on average one tourist spend 100RMB enjoying themselves in this scenic spot, the total value of output will be 5,000,000RMB and the annual profit can amount to 1,000,000RMB;In the second year 80,000 tourists are supposed to pay a visit here and on average one consume 180RMB, the total value of output will be 14,000,000RMB and the annual profit will be 3880,000RMB;In the third year the value of output will be 25,000,000RMB.It is predicted that within five years the profits can cover the total cost. The benefits will keep rising steadily if the management and service are improved continuously.

Process of the Project

Up till now the feasibility research of the project has already done and the project has already passed the investigation course. For more information about single-venture, joint investment or cooperation www.chinabidding.org

 

 

Tags:

admin Projects , ,